Why Is Our Commercial Building Heating and Cooling at the Same Time This Fall?

If your building is running heat in some zones and cooling in others on the same fall day, the cause is usually controls, not equipment. In Northern and Central New Jersey, fall days often start in the 40s and end in the 70s. Schedules, setpoints and economizer settings that worked in July can make rooftop units and terminal units work against each other. The most common culprits are heating and cooling setpoints set too close together, economizers stuck closed or out of calibration, and occupancy schedules that never got updated. This post explains how to spot simultaneous heating and cooling, which settings to check first, and when to have a technician tune your controls for the season.

Is Some Simultaneous Heating and Cooling Normal?

Some of it is. Large commercial buildings have interior zones that pick up heat from people, lighting, and equipment all year, while perimeter zones lose heat through glass and exterior walls. On a cool fall morning, an interior conference room can legitimately need cooling while a north-facing office needs heat.

The problem is when the same space, or the same air, is cooled and then reheated for no good reason. That wastes energy and usually brings comfort complaints: zones that swing between too warm and too cool, short-cycling units, and tenants adjusting thermostats all day.

What Causes Wasteful Simultaneous Heating and Cooling?

Setpoints with too little deadband

The deadband is the gap between the heating setpoint and the cooling setpoint. If heating is set at 71°F and cooling at 72°F, the system has almost no neutral zone. A small temperature swing flips the unit from heat to cool and back again. In fall, when loads change throughout the day, a narrow deadband causes constant mode hunting.

Economizers that are stuck, miscalibrated, or poorly set

An economizer uses outdoor air for “free cooling” when conditions allow. Fall is when economizers should be doing a lot of work. But a damper stuck closed means the unit runs mechanical cooling when cool outdoor air was available. A damper stuck open, or a failed mixed-air low limit, can dump cold air into the building and force heating to run harder. The economizer high-limit setting (fixed dry-bulb, differential dry-bulb, or enthalpy, depending on the control) also needs to be right for the climate and the equipment, or the economizer will lock out too early or too late.

Adjacent units fighting each other

In open floor plans, two rooftop units or zones can serve overlapping space. If one is set warmer and one cooler, or one sensor sits near a window and the other near a server closet, one unit heats while the neighbor cools the same air.

VAV reheat working harder than it should

In variable air volume (VAV) systems, the air handler supplies cool air and VAV boxes add reheat where zones need warmth. Some reheat is by design. Excessive reheat often comes from minimum airflow settings that are higher than needed, a supply air temperature that stays at summer levels instead of resetting upward in mild weather, or VAV box controls that are out of calibration.

Schedules and seasonal modes left on summer settings

Occupied and unoccupied schedules, optimal start, and seasonal changeover logic often get set once and forgotten. A building still running summer logic in fall can pre-cool spaces in the morning that will need heat an hour later.

Bad sensors

A drifted outdoor-air sensor can make the controls think it is warmer or colder outside than it is, which affects economizer decisions and changeover. A zone sensor in direct sun or next to a copier will call for cooling while the rest of the zone is cold.

How Can You Tell It Is Happening?

Common signs:

With a building automation system, trend data is the fastest way to confirm it. Without one, a technician can check unit operation, damper position, and sensor readings on site.

Fall Controls Tune-Up Checklist

Use this as a starting point with your facilities team or HVAC contractor:

When Should You Call a Technician?

Some fixes, like adjusting a schedule or widening a deadband, may be within reach of an in-house facilities team with BAS access. Others should go to a qualified technician: damper and actuator repairs, sensor replacement or calibration, economizer control setup, VAV box calibration, and sequence of operations changes.

Call sooner if complaints keep recurring, mild-day energy use looks high, or no one is sure what sequence the controls are actually running. Fall loads are moderate, so changes can be tested before winter.

FAQ

Is it bad if my building heats and cools at the same time?

Not always. Interior and perimeter zones can have different needs on the same day. It becomes a problem when the same space or the same air is cooled and then reheated, or when units switch modes over and over.

What is a deadband on a commercial thermostat?

It is the temperature range between the heating and cooling setpoints where the system does neither. A wider deadband reduces mode switching and wasted energy, as long as occupants stay comfortable.

Why does my economizer matter in fall?

Fall often brings outdoor air cool enough to handle much of a building’s cooling load. A working, correctly set economizer uses that air instead of running compressors. A stuck or miscalibrated economizer either wastes that opportunity or overcools the building.

Can a BAS fix simultaneous heating and cooling?

A building automation system can help a lot through schedules, deadbands, supply air reset, and trend logs that show the problem. But it only works if the sequences, sensors, and dampers are set up and working correctly.

Can KCG tune our controls for the shoulder season?

Yes. KCG provides commercial HVAC maintenance, controls, and energy management services across Northern and Central New Jersey, including economizer checks and seasonal controls adjustments. Call 973-335-3884.

KCG Energy Management is a veteran-owned commercial HVAC, refrigeration, and energy management contractor based in Moonachie, NJ (500 W Commercial Ave). NJ HVAC License #19HC00737600. If your building is fighting itself on mild fall days, we can review your setpoints, schedules, and economizers before heating season is in full swing.

Questions About Your HVAC System?

Our team is here to help with any commercial HVAC, refrigeration, or energy management questions.

Contact Us More Articles